Goodyear Rubber Products
CALL
TOLL FREE
IN THE USA
1-866-711-4673
INTERNATIONAL SALES CALL
+1-727-342-5086
WE SHIP WORLDWIDE
International Sales Click Here
Get A
Quote
Now
Home
About Us
Product Brands
Catalogs
Contact Us
Locations
Corporate Headquarters,
Clearwater, Florida, (FL)
Parker Store, Bradenton, Florida, (FL)
Parker Store, St. Petersburg, (FL)
Parker Store, Ft. Myers, Florida, (FL)
Parker Store, Naples, Florida, (FL)
Parker Store, Tampa, Florida, (FL)
<< Previous Page
Click Here
to open this page in a new window.
Next Page >>
4300Catalog Assembly/Installation FerulokAssembly Pre-SetInspection Pre-settingwithHyfersetToolorHydra-Tool AllFerulokfittingpresetsmustbedisassembledandinspected Pre-settingwithhydraulicequipment(HyfersetorHydra-Tool) forproperferrulepre-setbeforefinalinstallationforservice.The ispreferredfor fittingslargerthansize8orlargeproduction followingdetailedinspectionproceduresmustbefollowedregard- quantitiesinanysizes. lessofthemethodusedtopre-settheferruletothetube.(Refer ForfullinstructionontheuseoftheHyfersetTool(seeFig.T34), toFig.T33forthefiveinspectionpointsdiscussedbelow). pleaserefertoBulletin4393-B1,whichisincludedwitheach 1.Aridgeofmetal(A)hasbeenraisedabovethetubesurface shipmentoftheHyfersetKit#611049C. C B E Fig.T34�Hyfersettool A D Fig.T33�Ferulokpresetinspectionpoints Installation Useoneofthefollowinginstallationprocedures,dependingon thetoolingusedearliertopre-settheferruletothetubing. toaheightofatleast50%ofthethicknessoftheferrule's 1. Fittingbodyusedtopre-setferrule�Ifthefittingbody leadingedge,completelyaroundthetube. wasusedforferrulepre-set,re-tightenthenuttothesame 2.Whiletheleadingedgeoftheferrulemaybecoinedflat(B) fittingbodyusedearlierinthepre-set.Tightenthenutuntil thereisaslightbowtothebalanceofthepilotsection(C). asuddenandnoticeablewrenchresistanceisevident. 3.Thetailorbackendoftheferruleissnugagainstthetube Fromthispoint,tightenthenutanadditional (D). 1/6to1/4turn.(Analternativemethodistotakethenutto 4.Thereisaslightindentationaroundtheendofthetube(E) thefinger-tightposition,thenwrench-tightenanother thatindicatesthetubewasbottomedinthetoolorfitting 1/3to1/2turn).FNUcapsfollowthistighteningprocedure duringpre-setting(ifevidenceofthiscompletecontactisnot also. visibletheferrulemaynotbeproperlypre-set). 2. Hyferset,Hydra-ToolorFerulsetToolusedtoPre-set 5.Avoidrotatingtheferrule.Steelferrulesshouldnotbecapable Ferrule�Ifoneofthesetoolswasusedforferrulepre-set, ofmovingbackandforthalongthetubebeyondthebitearea selectanyappropriatefittingbodyandlubricateitsthreads. (astainlesssteelferrulewillmovemorethansteelbecause Conductre-tighteningfollowinganyoneofthetwometh- ofit'sspringbackcharacteristics). odsdescribedinprocedure1above. 3. Swivelnutassemblyprocedure(R6BU,C6BUand Caution:Wrenchtorqueshouldneverbeusedasthegauge S6BU)�Forfinalassemblyofswivelnut,a3/4turnfrom forreliableFerulokpre-setand/orassembly.Thereliabilityof fingertightisrequiredforallsizes. thepre-setandassemblyofbitetypefittingsisdependenton theferruletravelingaprescribeddistanceintothetaperedfit- tingthroatinordertobiteintothetubeandeffectastronggrip andseal. T24 ParkerHannifinCorporation TubeFittingsDivision Columbus,Ohio http://www.parker.com/tfd
Goodyear Rubber Products